Massive technical problems have delayed this post all week!
Start at the bottom for proper photo order.
Amazing.
Ring and pinion final drives like a truck.
The dome is filled with panes of leaded glass filled with mineral oil for optical clarity.
Observation window.
Locomotive built to move the test reactors on 4 sets of rails.
This was supposed to be installed in a massive bomber.
Reactor on the left.
Exhaust side of the reactor showing the twin J-47s on either side of the picture.
Massive amounts of pipes!
J-47 turbine engine being fed with the heated gas from the reactor.
Tig welded "flow" marking on a nickel superalloy pipe.
Looking west towards the reactor building.
Reactor portion would have been here.
Outside at the nuclear powered jet engines.
Chalkboard showing what rod cells are occupied.
Used fuel rod storage. This was one of the hottest parts of the building we were told.
Complete with scale to see if anyone has taken any nuclear material.
Fuel rod storage vault.
Women recognized 30 years later.
More chalk board info.
1950s goodness.
Standing where the machine shop would have been looking into the building.
Machine shop. Look at the engineers using the machine tools!